







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Home Additions & ADU: The Riverside Owner’s Guide
Unilock home additions and ADUs in Riverside typically run $45,000 – $130,000 installed, depending on square footage, foundation work, and whether you’re adding living space to your existing home or building a detached unit in the backyard. We stock Unilock-compatible materials and install them regularly, and most owners call us after noticing structural settling, water intrusion around the new foundation tie-in, or cracked pavers around the addition’s perimeter. The connection point where new construction meets the original slab is where Unilock systems usually show their age first, especially through Riverside’s hot, dry summers and occasional heavy winter rains.
Which Unilock Models This Applies To

Unilock’s paver and wall systems are the backbone of most Riverside home additions and ADU projects we see, and compatibility comes down to the specific product line. The Estate Series pavers, Brussels Block, and Town Hall all have different joint widths and base requirements, and mixing lines at the transition point between old patio and new addition is the most common mistake we’re called to correct. Check the underside of a loose paver for the stamped product code; if the stamp is worn, measure the paver’s thickness and joint spacing and we can match it from our Riverside inventory.
For the actual structural part of a home addition or ADU, the Unilock components are almost always the exterior hardscape: paver patios, retaining walls that hold back grade, and walkways that tie the addition to the rest of the yard. OEM Unilock pavers carry a transferable lifetime warranty on structural integrity, but that warranty covers the paver itself, not the base preparation or the settlement that happens when Riverside’s expansive clay soil shifts. Quality aftermarket equivalents exist, but for additions and ADUs we recommend staying with OEM Unilock because the color blends and dimensional tolerances stay consistent from batch to batch, which matters when you’re adding to a patio five years later.
Styles & brands we work with






Signs Your Unilock Home Additions & ADU Is Failing
- Settling or sinking pavers around the addition. Riverside’s clay soil expands when wet and contracts when dry, and if the base wasn’t compacted in lifts, the pavers around your new addition will start to sink within two or three seasons.
- Gaps opening between the addition’s foundation and the existing slab. This usually means the new foundation wasn’t doweled into the old one properly, or the soil beneath compacted after the pour. Left alone, water gets in and the gap widens.
- Water pooling against the addition’s exterior wall. If the surrounding pavers or concrete were pitched toward the building instead of away, Riverside’s winter rains will find their way under the sill plate, and that’s where dry rot starts.
- Retaining walls leaning or cracking near the ADU. Unilock segmental retaining walls rely on geogrid reinforcement and proper drainage behind the wall. If the wall is pushing out, the grid was likely skipped or the drainage stone wasn’t installed, and the pressure builds every time it rains.
- Doors and windows sticking in the new addition. This is a sign of foundation movement. Riverside’s temperature swings cause concrete to expand and contract, and if the addition’s slab wasn’t isolated properly from the original foundation, the two move at different rates.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Home additions in Riverside run $45,000 – $130,000, and ADU construction typically lands between $90,000 and $220,000 depending on whether you’re building detached with a full kitchen and bath or converting existing space. What drives the number is the foundation type (slab versus raised, and whether we’re cutting into existing concrete to tie in), the roofline (tying into an existing roof costs less than a full new roofline), and the finish level inside. A garage conversion in Riverside, for example, usually falls between $30,000 and $80,000 because the shell already exists and we’re working inside it.
Every project gets a written price before any work starts, materials included, with a line-item breakdown so you can see exactly where the money goes. The number on the estimate is the number on the invoice. If we open a wall and find something unexpected, we stop and talk to you before spending another dollar, and the change is in writing before it’s approved. All work carries our 365-Day Done Right Promise: if it fails inside the guarantee period, we come back and make it right at no charge.
DIY or Call Us?
There are things you can safely check on your own: look at the pavers around your addition and note where water sits after a rain, watch for cracks in the foundation that widen over a month, and keep an eye on retaining walls for any tilt. These observations help us diagnose faster when we come out. What you shouldn’t touch is the structural work: cutting into a foundation, removing load-bearing walls, or re-grading around an existing slab. Riverside’s soil conditions make this trickier than most homeowners expect, and a mistake in the base or the drainage layer is expensive to undo.
If you’re seeing any of the warning signs above, call us at (341) 895-1170 and describe what you’re seeing. Trevor will give you a straight answer about whether it’s urgent, and the estimate visit is free. Give you a number before we pick up a tool, that’s just how this works.
FAQs

A properly built addition or ADU in Riverside should last 50 years or more on the structural side, but the paver hardscape around it typically needs re-leveling or base correction every 10 – 15 years because of the clay soil’s expansion and contraction cycles. Call (341) 895-1170 if you want us to look at what you have and give you an honest read on what’s left in it.
Most of the time, yes. Settling pavers can be lifted and re-based, retaining walls can be partially rebuilt with proper drainage added, and foundation gaps can be sealed and monitored. Full replacement is usually only necessary when the foundation itself has failed or water damage has compromised the framing. We’ll tell you which one you’re looking at before quoting anything.
A typical home addition runs 3 – 6 months from permit to final walkthrough, and a detached ADU usually takes 6 – 12 months depending on utility connections and city inspections. The permitting process in Riverside adds time no contractor can skip, but we pull all permits and handle every inspection for you.
Yes. We keep the most common Unilock lines and matching joint sand in our Riverside inventory, and we can order any specialty series within a week. We also work with KraftMaid, Cambria, and Silestone for the interior finishes, so the cabinets, countertops, and hardscape all come from brands with real warranties behind them.
Written by Trevor Nash, Owner, Penhallow Remodeling Riverside at Penhallow Remodeling Riverside, serving Riverside and nearby areas.


